Abstract:
The design of steel formwork for highways needs to follow multiple requirements to ensure construction quality and safety
The design of steel formwork for highways needs to follow multiple requirements to ensure construction quality and safety. The following is a detailed analysis:
Design principles
Practicality: The template joints should be tight and not leak grout, ensuring that the shape, size, and position of the components are correct, the structure is simple, and the support and disassembly are convenient.
Safety: It needs to have sufficient load-bearing capacity, rigidity, and stability to reliably withstand the weight of poured concrete, lateral pressure, and construction loads.
Economy: Adapt measures to local conditions, use local materials, reduce one-time investment, increase turnover times, and reduce labor costs for dismantling while ensuring construction period and quality.
Load consideration
Permanent loads: including the self weight of formwork and its supports, the self weight of newly poured concrete, the self weight of steel bars, etc.
Variable loads: including loads from construction personnel and equipment, loads generated during concrete vibration, pressure from newly poured concrete on the side of the formwork, loads generated during pouring concrete, etc.
Materials and Construction
Material selection: The panel should be made of high-quality steel, such as Q345 high-strength low-alloy steel, to ensure strength and toughness; The connecting and supporting components should also comply with relevant standards.
Component design: The specifications and spacing of panel thickness, back ribs, trusses, and other components should be designed reasonably to ensure the overall stiffness and stability of the formwork.
Production and processing
Precision control: Template production must strictly control the dimensional accuracy. The width, length, assembly hole spacing, and hole position of the flat template must meet the design requirements. The angles and dimensions of the internal and external corner templates must also be accurate.
Quality inspection: After processing, a comprehensive inspection of the appearance quality, dimensional accuracy, and component connection firmness of the template should be carried out to ensure that the template quality meets the standards.
Installment and use
Installation requirements: The template installation should be flat and firm, with tight joints. Adjacent templates should be flat and tight, and the support system should be firm and reliable. The tension bolts should be tightened to ensure that the template does not deform or shift during the concrete pouring process.
Construction coordination: When pouring concrete, the pouring speed and slump should be reasonably controlled to avoid excessive impact on the formwork; When vibrating, the vibrator should be inserted vertically into the concrete and avoid colliding with the formwork.
Demolition and maintenance
Demolition timing: The formwork and its supporting system can only be dismantled after the concrete strength meets the design requirements.
Maintenance: Regularly clean, remove rust, apply oil and other maintenance work on the template, promptly repair deformed and damaged parts, and ensure the service life of the template
Design principles
Practicality: The template joints should be tight and not leak grout, ensuring that the shape, size, and position of the components are correct, the structure is simple, and the support and disassembly are convenient.
Safety: It needs to have sufficient load-bearing capacity, rigidity, and stability to reliably withstand the weight of poured concrete, lateral pressure, and construction loads.
Economy: Adapt measures to local conditions, use local materials, reduce one-time investment, increase turnover times, and reduce labor costs for dismantling while ensuring construction period and quality.
Load consideration
Permanent loads: including the self weight of formwork and its supports, the self weight of newly poured concrete, the self weight of steel bars, etc.
Variable loads: including loads from construction personnel and equipment, loads generated during concrete vibration, pressure from newly poured concrete on the side of the formwork, loads generated during pouring concrete, etc.
Materials and Construction
Material selection: The panel should be made of high-quality steel, such as Q345 high-strength low-alloy steel, to ensure strength and toughness; The connecting and supporting components should also comply with relevant standards.
Component design: The specifications and spacing of panel thickness, back ribs, trusses, and other components should be designed reasonably to ensure the overall stiffness and stability of the formwork.
Production and processing
Precision control: Template production must strictly control the dimensional accuracy. The width, length, assembly hole spacing, and hole position of the flat template must meet the design requirements. The angles and dimensions of the internal and external corner templates must also be accurate.
Quality inspection: After processing, a comprehensive inspection of the appearance quality, dimensional accuracy, and component connection firmness of the template should be carried out to ensure that the template quality meets the standards.
Installment and use
Installation requirements: The template installation should be flat and firm, with tight joints. Adjacent templates should be flat and tight, and the support system should be firm and reliable. The tension bolts should be tightened to ensure that the template does not deform or shift during the concrete pouring process.
Construction coordination: When pouring concrete, the pouring speed and slump should be reasonably controlled to avoid excessive impact on the formwork; When vibrating, the vibrator should be inserted vertically into the concrete and avoid colliding with the formwork.
Demolition and maintenance
Demolition timing: The formwork and its supporting system can only be dismantled after the concrete strength meets the design requirements.
Maintenance: Regularly clean, remove rust, apply oil and other maintenance work on the template, promptly repair deformed and damaged parts, and ensure the service life of the template
Disclaimer: The content provided on this website is for reference only (some information is sourced from the internet). The publication of content information is for the purpose of transmission and does not represent the views of this website. If the content involves copyright issues, please contact the website editor in a timely manner, and we will take appropriate measures to avoid unnecessary losses for both parties.
Related article
- Renting Steel Formwork Rental Station: How to Determine the Material and Density of Steel Formwork?
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- List of rental prices for steel formwork: Key points for acceptance of bridge formwork after delivery to the construction site
- Customized processing of bridge steel formwork: how to prevent and deal with unstable formwork support?
- Customized specifications for steel formwork: What factors need to be considered in calculating the weight of steel formwork?
- Customization of steel formwork specifications: What are the installation steps for steel formwork?
- Steel formwork manufacturer: How to deal with and prevent steel formwork running and bursting?
- Manufacturer of standardized steel formwork: How much impact does leakage of formwork joints have on structural safety?
- Bridge anti-collision guardrail steel formwork: What are the common methods for correcting steel formwork?
- Customized manufacturer of composite steel formwork: How to prevent and deal with steel formwork that is not allowed to be reserved or embedded?
- Customization of steel formwork specifications: What are the installation steps for steel formwork? 双语对照 笔记
- Rental of construction steel formwork: How to choose suitable steel formwork materials?
Hot article

- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- 力“拔”山兮,“河”作共赢——济宁天力员工欢度国庆假期之拔河比赛
Recommended article

Customized rental of construction steel formwork: How to prevent and deal with loose joints in steel formwork?

Customized rental of steel formwork: What are the dimensions, specifications, and models of steel formwork?
- Customized rental of construction steel formwork: How to prevent and deal with loose joints in steel formwork?
- Customized rental of steel formwork: What are the dimensions, specifications, and models of steel formwork?
- Steel formwork manufacturer supply specifications: What are the applicable fields for steel formwork
- 力“拔”山兮,“河”作共赢——济宁天力员工欢度国庆假期之拔河比赛
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition
- Pulling out Mountains and Rivers for Win Win - Jining Tianli Employees Celebrate National Day Holiday with Tug of War Competition