Application scenario
The applicable scenarios for waterproof board trolleys include:
1) Underground comprehensive engineering
① Subway and Urban Tunnels
Suitable for the construction of subway tunnels and urban underground comprehensive pipe galleries, reducing construction dust and noise through enclosed operations, and minimizing the impact on the surrounding environment and traffic.
② Water diversion tunnel and hydraulic engineering
Adapt to projects such as water diversion tunnels and hydropower stations, improve the efficiency of waterproof layer laying by automatically rolling geotextiles and waterproof boards, and meet high impermeability requirements.
2) Complex structural construction scenarios
① Construction of Tunnel Irregular Section
Supporting irregular cross-sections such as curved tunnels and multi arch tunnels, the curvature of the waterproof layer is precisely controlled through an arc-shaped rotating mechanism to ensure a tight fit with the tunnel wall.
② Reinforcement binding and positioning
Equipped with lining steel bar positioning fixtures, it can control the spacing, spacing, and protective layer thickness of steel bars, improving the accuracy of steel bar binding and construction quality.
3) Demand for efficient mechanized construction
① Automated material laying
By using pneumatic rivet gun and rotating motor linkage, the waterproof board can be fixed in a single cycle, reducing manual operation steps and improving overall efficiency by more than 30%.
② Multi process integrated operation
Integrating waterproof board laying, geotextile installation, and hole wall leveling functions, reducing equipment switching time and shortening the critical construction period of tunnel construction.
4) Adaptation to special construction environments
① High precision waterproof layer construction
Combined with hydraulic adjustment system, achieve millimeter level waterproof board overlap accuracy, meeting the strict standards for waterproof performance in high-speed railway tunnels, underwater tunnels, and other areas.
② Narrow space operation
Modular design adapts to the limited space inside the tunnel, and flexibly adjusts the working height through translation mechanisms and lifting cylinders to ensure construction safety under complex working conditions.
Note: In practical applications, the radius of the rotating mechanism arc should be selected according to the tunnel section size, and the operating status of the hydraulic system (pressure 16MPa) and motor (power 5.5kW) should be regularly checked to prevent material laying deviation or equipment failure.